Development of the execution project of the 65.55 MWp Fausita PV Power Plant.

STAGE: Executive Project
YEAR: 2022 and 2023
LOCATION: Murcia and Torre Pacheco, Spain
TYPOLOGY: Photovoltaic Power Plant.
DESCRIPTION: 65.55 MWp Photovoltaic Power Plant with tracker on a horizontal axis in the municipality of Murcia and Torre Pacheco, Murcia (Spain).

The scope of the project includes the development of the execution project of the solar photovoltaic plant and its link installation for connection to the FAUSITA SOLAR private substation. In this way, all the necessary documentation is presented for the processing of the corresponding administrative construction authorization by the General Directorate of Energy and Industrial and Mining Activity of the Region of Murcia.

The installation has 3 clearly differentiated parts: the solar photovoltaic plant with 17 transformation centers, the protection and measurement center and an underground medium voltage line to the FAUSITA SOLAR substation (220/30 kV).

The solar photovoltaic plant is made up of 102.432 photovoltaic panels of 640 W and 269 inverters of 215 kVA and 17 transformation centers of 3150 kVA 0,8/30 kV.

The protection and measurement center is the point where the information measurement equipment for the client is located.

To link the private installation with FAUSITA SOLAR private substation (220/30 kV), there is a 3.310 m underground medium voltage line (30kV).

The photovoltaic power plant presents a series of conditions, for which the corresponding documents are presented to guarantee administrative authorization.

Other projects