PROJECT: Competition
YEAR: 2013
LOCATION: Salford, United Kingdom.
TYPOLOGY: Cable-stayed bridge.
MATERIALS: Structural Steel and Reinforced Concrete
STRUCTURAL DESIGN: GmasP.
ARCHITECTURAL DESIGN: GmasP

The footbridge is a sculptural landmark joining both river banks. The cable stayed structure has a length of 80m, with a V-shaped mast. The mast supports the deck by means of cables arranged in harp configuration and is supported by two backstay cables aligned with its top edge.